Black & Decker KW800 Guide de l'utilisateur Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
88
BENCH OPERATION
R9PLUS Dovetail Jig User Guide
Making The Beam
Chapter 1
A
C
D
B
REV 040314
5/16
"
1
7/8
"
5/16
"
dia. x 1/4
"
deep
4
1/2
"
[114mm]
[8mm]
[47mm]
[8mm x 6.35mm]
A
A
B
B
A
1-13 Turn the assembly upside down. Take a piece of the
predrilled sacrificial board and lay it flush on the template.
1-15 Place the clamping surface
A
against the beam
B,
flush
against the sacrificial board. Be sure the clamp hole layout
marks
C
are next to the sacrificial board
D
. Screw the clamping
surface to the beam through the countersunk holes. If screwing
into a hardwood beam, first drill pilot holes in the beam.
1-17
Sidestop Positioning
Create layout lines as indicated
above for the sidestop
A
.
Note:
Be precise. Sidestop positioning
is very important.
1-14 Using the two
5
16"[8mm] holes as drill guides, drill
two
5
16"[8mm] holes through the beam. Attach the sacrificial
board at the left end with a ¼-20 machine screw and wing nut.
Then move the template to its second position and install the
second screw.
1-16
Clamp Holes Drill all
3
4
"[19mm] clamp holes
A
square
to the beam, through the clamping surface and beam. Next,
drill two holes (as per beam drawing),
5
16"[8mm] diameter and
9
16"[14mm] deep, for the table glide
B
(used for router table
operation only).
1-18 Using a Brad Point or Forstner bit, counter bore a
5
16"[8mm] hole
A
,
1
4"[6,35mm] deep for the sidestop hub.
Then, using a
3
32"[2,5mm] bit, drill a pilot hole for the sidestop
mounting screw. Attach the sidestop to the beam with the
provided No.8 x 1
1
4"[30mm] round head screw
B
.
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 19 20

Commentaires sur ces manuels

Pas de commentaire