Black & Decker SDC850 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Cafetières Black & Decker SDC850. Addendum II - Alamo Colleges Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
1743 N. Main Ave., Bldg. 41, Room 101 / San Antonio, TX 78212-4299 / (210) 485-0100 / www.alamo.edu
Purchasing & Contract Administration
September 23, 2014
ADDENDUM II
PURCHASE OF CONSTRUCTION SERVICES
FOR RENOVATION OF OZUNA BUILDING PHASE II
FOR ALAMO COLLEGES PALO ALTO COLLEGE
CSP No. 14C-031
I. See attached Addendum No. 2, issued by O’Connell Robertson (47 pages 8 ½ x 11
Specifications & 20 pages 30 x 42 Drawings)
II. In response to questions received:
1. Question: When is the anticipated construction start date for this project?
Answer: Anticipated start date for this project is January, 2015.
2. Question: Is it acceptable for contractors to provide paper copies of the proposal at
deadline and the electronic copy by 4pm on the same day?
Answer: In this instance, it is acceptable to submit an electronic copy of proposal by
4pm on the same day.
3. Question: Is it acceptable for contractors to provide the SMWBE plan by 4pm of
proposal deadline date after proposal and pricing is turned in at 2pm?
Answer: In accordance with Instructions to Offerors, the SMWBE plan is part of the
proposal documents and is required to be submitted prior to proposal deadline.
4. Question: Are there any required subcontractors from phase 1 which need to be
utilized for phase 2?
Answer: The required subcontractors from phase 1 are: JPM for the cable pulls,
Simplex Grinnell for the fire alarm and Schneider Electric for the building
automation systems. Alamo Colleges will contract directly with these vendors and
awarded contractor will only need to coordinate work schedules.
III. Please note, the deadline for submitting this proposal has been extended to September
30
th
, 2014, at 2pm local time.
IV. Please acknowledge receipt of this Addendum II with your response.
Vue de la page 0
1

Résumé du contenu

Page 1

1743 N. Main Ave., Bldg. 41, Room 101 / San Antonio, TX 78212-4299 / (210) 485-0100 / www.alamo.edu Purchasing & Contract Administration Septem

Commentaires sur ces manuels

Pas de commentaire